The Project

Engineering for the next century of trade

Aerial illustration of the planned canal route

A Plan with Three Parts

The Eurasian Silk Road Canal is planned as infrastructure with a service life of a hundred years. It rests on three elements.

  • The waterway. A reinforced 300 km channel sized for capacity and safety, open in both directions to the largest ships in service.
  • The ports. Deep-water terminals at Burgas on the Black Sea and Makri on the Aegean, each with a logistics park alongside, working as transshipment hubs.
  • The systems. A digital layer combining a Vessel Traffic Service (VTS) with satellite tracking to manage navigation and cargo flow.

Built to Be Safe and to Last

The full length of the channel is to be lined with high-tensile reinforced concrete to hold its shape and resist erosion. Its width allows for turning basins and safety ledges. Traffic will be guided by VTS with satellite positioning, long-range radar and experienced pilots.

Scale

Length
300 km
Width
700 m
Depth
30 m

Capacity

Unrestricted two-way traffic
2-way
Vessels per day
400-600
Navigation support
24/7

Vessels

Passability for the largest classes
100%
Design standard
ULCS / ULCC
Design life
100 yrs

The aim is to remove the bottlenecks of the region and offer the most efficient sea corridor in Europe.

Two Ports, Two Anchors

Development plan of the Port of Burgas
Planned development

Burgas, the Black Sea Gateway

A complete modernisation is planned, with longer berths and new crane systems, to make Burgas the leading deep-water hub of the Black Sea and the point where cargo from the East enters the canal.

Plan of the new Port of Makri
Planned development

Makri, the Aegean Hub

A purpose-built deep-water port on the Aegean coast is planned as the southern anchor of the canal, serving the Mediterranean and Western Europe, with free-trade zones and logistics parks beside it.

Timeline to Operation

Overall horizon of 12 to 15 years

  1. 1Design and permitting, 3 years
  2. 2Earthworks and canal construction, 10 to 12 years
  3. 3Port development, 4 to 5 years, in parallel with phase 2
  4. 4Systems integration and opening, 2 years